| |
Phase V - Maximize Shipping Capability
$42,800,000 Capital Improvement
Maximize Shipping Capability 700,000 tons
- Gerdau MACSTEEL-MI
- Upgrade scrap handling and weighing systems
- Increase cast size 195mm caster
- Auto mold level control
- Upgrade bar handling
- Inspection enhancements
- Mill crane
|
- Gerdau MACSTEEL - AR
- Improve EAF lime system
- Increase caster metallurgical height
- Increase caster cooling capacity
- Inspection enhacements
- Specialized Heat Treatment furnace
|
- Over $19M will be invested in MAC-MI
- Over $23M will be invested in MAC-AR
- MAC-AR will increase capacity from 375,000 tpy to 420,000 tpy
- MAC-MI will increase capacity from 245,000 tpy to 280,000 tpy
- This Phase V will smooth all operations for maximum effectiveness to handle the higher volumes.
- Hot metal logistics will be improved with new ladle reconditioning areas, pre-heaters and furnace current conducting arms.
- Caster water systems will be upgraded or enlarged and added cooling capacity installed.
- Material handling will be upgraded.
|
Summary
Gerdau MACSTEEL Home
Profile |
Capabilities |
Quality |
Engineered Bar Products |
NitroSteel Division
Heating Treating Division |
Capital Improvement |
News Releases/Hot Links |
Site Map |
Contact Info |
Metallurgical Data Book
|